Learn More about Fully Installed

Adder Rates

These are the rates we pay installers for extra work performed.
This is in addition to the .50/watt standard pay.

Adder
rate
Main Panel Upgrade
$2,200 (equipment + install by Contractor)
Meter Service Drop/Load Side Tap
$750
Panel Derate
$400
Ground Mount
$0.50/watt (equipment + install by Contractor)
Trenching
$10/ft
Ballasted/Flat Roof
$0.05/watt
35-degree Pitch Roof
$0.15/watt
Attic Run
$500
Smaller than 4kW System
$500
Smaller than 2kW System
$1000
5 hrs. or more round trip
$450
8 hrs. or more round trip
$650
Battery & Smart Switch
$2,000
Additional Batteries
$500/battery

Below are the rates charged to sellers for equipment and service adders. These rates are in addition to the $2.10/watt EPC rates.

Adder
rate
Main Panel Upgrade
$2,200 (equipment + install by Contractor)
Meter Service Drop/Load Side Tap
$750
Panel Derate
$400
Ground Mount
$0.50/watt (equipment + install by Contractor)
Trenching
$10/ft
Ballasted/Flat Roof
$0.05/watt
35-degree Pitch Roof
$0.15/watt
Attic Run
$500
Smaller than 4kW System
$500
Smaller than 2kW System
$1000
5 hrs. or more round trip
$450
8 hrs. or more round trip
$650
Battery & Smart Switch
$2,000
Additional Batteries
$500/battery

How it Works

At Fully Installed, we're focused on efficiency. Our software and CRM enables us to fly through engineering, permitting and equipment procurement, leaving installers to do what they do best - install.

Deals sold through our partnered sales channels become available for installers to claim on the Fully Network.

Claim jobs to load balance your crews, ensuring you are never paying for idle workers.

On the day of installation, the Fully Installed Partners install and complete the interconnection grid-tie.

80% of the install value is paid upon completion of the work, while 20% is retained until PTO.

How to become a Partner?

To become a Fully Installed Partnered Installer, we require that you must meet specific requirements and agree to our terms:

  • Must be a licensed general contractor.
  • Must have or operate under a master electrician license.
  • Must offer and sustain a 10-year workmanship warranty to all Project Solar customers you install for.
  • Must perform installation within 30 days of accepting job, 13 days of permits being issued.
  • Must submit pictures of every major step in the install process.
  • Must supply BOS materials.
  • Must maintain insurance and bonding.

To maintain efficient and streamlined processes, we handle all aspects of the permit application and submittal. To do this on your behalf, we will need to apply using your licenses. This is required and non-negotiable.

Equipment Replacement/Warranty Service

If a piece of equipment needs replaced, we ask that you make yourself available to facilitate the equipment swap within 30 days of the new part being received. The customer will pay, according to the contract, up to $80/hour for the labor incurred and a $100 truck roll, directly to you, the installer

Payment Terms

80%
After installation is complete and pictures have been provided.
20%
After PTO

All payments are made via ACH/direct deposit.

3 Strikes Rule

As a Fully Installed Partnered Installer, you act as a representative of the Partnered Sellers and their brand. This is something we do not take lightly. If you fail to perform the agreed job in accordance with our terms and conditions, or if a customer files a complaint that is not rectified in a timely manner, you will be removed from our install network upon first offense.

If you have 3 complaints that do not require rectification but reflect poorly on your service, you will be removed from the Fully Installed Installer Network.